Checkbox input: Select 21017-FRA-XX-ZZ-DR-A-91-0001_P4-Site Location Plan.pdf for download.
FRA-XX-ZZ-DR-A-91-0001-REVP4 - LOCATION PLAN
22/08/2022
Checkbox input: Select 21017-FRA-XX-ZZ-DR-A-9111_P8_Parameters Plan 1.pdf for download.
22/12/2022 SUPERSEDED FRA-XX-ZZ-DR-A-9111-REV-P8 - PARAMATERS PLAN 1 DEV. ZONES. LAND USE, QUANTUM& BUILDING HEIGHTS
22/08/2022
Checkbox input: Select 21017-FRA-XX-ZZ-DR-A-9112_P10_Parameters Plan 2.pdf for download.
22/12/2022 SUPERSEDED FRA-XX-ZZ-DR-A-9112-REV-P10 - PARAMETERS PLAN 2 HIGHWAYS AND ACCESS
22/08/2022
Checkbox input: Select 21017-FRA-XX-ZZ-DR-A-9113_P9_Parameters Plan 3.pdf for download.
22/12/2022/SUPERSEDED FRA-XX-ZZ-DR-A-9113-REV9 - PARAMATERS PLAN 3 STRATEGIC LANDSCAPE
22/08/2022
Checkbox input: Select 84465-WSP-XX-DR-010.pdf for download.
22/12/2022 SUPERSEDED 84465-WSP-XX-DR-010-REV-P01 - STANIFIELD LANE ACCESS JUNCTION TO PHASE D
22/08/2022
Checkbox input: Select 84465-WSP-XX-DR-011.pdf for download.
22/12/2022 SUPERSEDED 84465-WSP-XX-DR-011-REV-P01 - HIGHWAYS LAYOUT
22/08/2022
Checkbox input: Select SF 3236 LM01 Rev G - Green Infrastructure A.pdf for download.
22/12/2022 SUPERSEDED SF3236-LM01-REVG - LANDSCAPE PROPOSALS GREEN INFASTRUCTURE A
22/08/2022
Checkbox input: Select SF 3236 LM02 Rev G - Landscape Proposals Phase A.pdf for download.
22/12/2022 SUPERSEDED SF3236-LM02-REVG - LANDSCAPE PROPOSALS - PHASE A
22/08/2022
Checkbox input: Select SF 3236 LM03 Rev F - Landscape Proposals Phase B.pdf for download.
22/12/2022 SUPERSEDED SF3236-LM03-REVF - LANDSCAPE PROPOSALS - PHASE B
22/08/2022
Checkbox input: Select SF 3236 LM04 Rev F - Landscape Proposals Phase C.pdf for download.
SF3236-LM04-REVF - LANDSCAPE PROPOSALS - PHASE C
22/08/2022
Checkbox input: Select SF 3236 LM05 Rev F - Landscape Proposals Phase D.pdf for download.
SF3236-LM05-FEVF - LANDSCAPE PROPOSALS - PHASE D
22/08/2022
Checkbox input: Select MMD-357876-C-DDR-00-0007.pdf for download.
MMD-357876-C-DDR-00-0007 PROPOSED SITE LAYOUT GENERAL ARRANGEMENT OVERVIEW
06/09/2022
Checkbox input: Select MMD-370964-C-DR-00-XX-0014.pdf for download.
MMD-370964-C-DR-00-XX-0014 JUNCTION 5A
06/09/2022
Checkbox input: Select MMD-370964-C-DR-00-XX-0015.pdf for download.
MMD-370964-C-DR-00-XX-0015 JUNCTION 5 OPTION B
06/09/2022
Checkbox input: Select 84465-WSP-XX-DR-004_1-2500.pdf for download.
22/12/2022 SUPERSEDED 84465-WSP-XX-DR-004-1-2500 M65 TERMINUS ROUNDABOUT
06/09/2022
Checkbox input: Select SF3236 AIA01 - Rev A-1 of 5 Phase A Green Infrastructure.pdf for download.
10/02/2023 SUPERSEDED SF3236-AIA01 REV A - 1 OF 5 PHASE A GREEN INFASTRUCTURE
09/01/2023
Checkbox input: Select SF3236 AIA01 - Rev A-2 of 5 Phase A Green Corridor.pdf for download.
10/02/2023 SUPERSEDED SF3236-AIA01 REV A - 2 OF 5 PHASE A GREEN CORRIDOR
09/01/2023
Checkbox input: Select SF3236 AIA01 - Rev A-3 of 5 Wigan Rd Junction.pdf for download.
10/02/2023 SUPERSEDED SF3236-AIA01 REV A - 3 OF 5 WIGAN ROAD JUNCTION
09/01/2023
Checkbox input: Select SF3236 AIA01 - Rev A-4 of 5 Stainfiled Ln.Junction.pdf for download.
10/02/2023 SUPERSEDED SF3236-AIA01 REV A - 4 OF 5 STANIFIELD LANE JUNCTION - AONE D WEST
09/01/2023
Checkbox input: Select SF3236 AIA01 - Rev A-5 of 5 Zone D East.pdf for download.
10/02/2023 SUPERSEDED SF3236-AIA01 REV A - 5 OF 5 ZONE D EAST
09/01/2023
Checkbox input: Select 84465-WSP-XX-DR-001 Rev A Wigan Road Accesss Junction.pdf for download.
DR-001 REV A WIGAN ROAD ACCESS JUNCTION
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-002 Rev A Stanifield Lane Access Junction to Phase D.pdf for download.
DR-002 REV A STANIFIELD LANE ACCESS JUNCTION TO PHASE 3
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-003 Rev A Stanifield Lane Access to Residential Phase.pdf for download.
DR-003 REV A STANIFIELD LANE ACCESS TO RESIDENTIAL PHASE
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-004 Rev A M65 Terminus Roundabout.pdf for download.
22/12/2022 AMENDED DR-004 REV A M65 TERMINUS ROUNDABOUT
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-005 Rev B Highways Layout Sheet 1 of 3.pdf for download.
DR-005 REV B HIGHWAYS LAYOUT SHEET 1 OF 3
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-005 Rev B No Tracking Highways Layout Sheet 1 of 3.pdf for download.
DR-005 REV B NO TRACKING HIGHWAYS LAYOUT SHEET 1 OF 3
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-006 Rev B Highways Layout Sheet 2 of 3.pdf for download.
DR-006 REV B HIGHWAYS LAYOUT SHEET 2 OF 3
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-007 Rev B No Tracking Highways Layout Sheet 3 of 3.pdf for download.
DR-007 REV B NO TRACKING HIGHWAYS LAYOUT SHEET 3 OF 3
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-010 Rev A Stanifield Lane Access Junction to Phase D.pdf for download.
10/02/2023 SUPERSEDED 22/12/2022 AMENDED DR-010 REV A STANIFIELD LANE ACCESS JUNNCTION TO PHASE D
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-011 Rev B Highways Layout.pdf for download.
22/12/2022 AMENDED DR-011 REV B HIGHWAYS LAYOUT
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-011 Rev B No Tracking Highways Layout.pdf for download.
22/12/2022 AMENDED DR-011 REV B NO TRACKING HIGHWAYS LAYOUT
10/01/2023
Checkbox input: Select 84465-WSP-XX-DR-012 Rev A Wigan Road Access Junction.pdf for download.
22/12/2022 AMENDED DR-012 REV A WIGAN ROAD ACCESS JUNCTION
10/01/2023
Checkbox input: Select 21017-FRA-XX-XX-DR-A-9124-P2-P R of W - Sheet 1 of 2.pdf for download.
DR-A-9124-P2 PUBLIC RIGHTS OF WAY - SHEET 1 OF 2
10/01/2023
Checkbox input: Select 21017-FRA-XX-XX-DR-A-9125-P4-Public Right of Ways - Sheet 2 of 2.pdf for download.
DR-A-9125-P4 PUBLIC RIGHTS OF WAY - SHEET 2 OF 2
10/01/2023
Checkbox input: Select B381371C.PDF for download.
22/12/2022 AMENDED DR-A-91-1000-P12 ILLUSTRATIVE DEVELOPMENT FRAMEWORK PLAN
10/01/2023
Checkbox input: Select 21017-FRA-XX-ZZ-DR-A-9111_P11_Parameters Plan 1.pdf for download.
20/07/2023 SUPERSEEDED 22/12/2022 AMENDED DR-A-9111-P11 PARAMETERS PLAN 1 - DEV ZONES, LAND USE, QUANTUM & BUILDING HEIGHTS
10/01/2023
Checkbox input: Select 21017-FRA-XX-ZZ-DR-A-9112-P16_Parameters Plan 2.pdf for download.
20/07/2023 SUPERSEEDED 22/12/2022 AMENDED DR-A-9112-P16 PARAMETERS PLAN 2 - HIGHWAYS AND ACCESS
10/01/2023
Checkbox input: Select 21017-FRA-XX-ZZ-DR-A-9113_P12_Parameters Plan 3.pdf for download.
20/07/2023 SUPERSEDED 22/12/2022 AMENDED DR-A-9113-P12 PARAMETERS PLAN 3 - STRATEGIC LANDSCAPE
10/01/2023
Checkbox input: Select SF 3236 LL01 Rev B - Landscape Proposals - Green Infrastructure.pdf for download.
22/12/2022 AMENDED SF3236-LL01 REV B LANDSCAPE PROPOSALS - GREEN INFASTRUCTURE
11/01/2023
Checkbox input: Select SF 3236 LL02 Rev B - Stanifield Lane Access Junction to Phase D.pdf for download.
22/12/2022 AMENDED SF3236-LL02 REV B STANIFIELD LANE ACCESS JUNCTION TO PHASE D
11/01/2023
Checkbox input: Select SF 3236 LL03 Rev B - Wigan Road Access Junction.pdf for download.
22/12/2022 AMENDED SF3236-LL03 REV B WIGAN ROAD ACCESS JUNCTION
11/01/2023
Checkbox input: Select SF 3236 LL04 Rev A - Lands Prop - Green Infrastructure Zone A (1).pdf for download.
20/07/2023 Superseded SF3236-LL04 REV A LANDSCAPE PROPOSALS - GREEN INFASTRUCTURE ZONE A
11/01/2023
Checkbox input: Select SF 3236 LL05 Rev A - Lands Prop - Green Infrastructure Zone B.pdf for download.
20/07/2023 Superseded SF3236-LL05 REV A LANDSCAPE PROPOSALS - GREEN INFASTRUCTURE ZONE B
11/01/2023
Checkbox input: Select SF 3236 LL06 Rev A - Lands Prop - Green Infrastructure Zone C.pdf for download.
20/07/2023 Superseded SF3236-LL06 REV A LANDSCAPE PROPOSALS - GREEN INFASTRUCTURE ZONE C
11/01/2023
Checkbox input: Select SF 3236 LL04 Rev A - Lands Prop - Green Infrastructure Zone A (2).pdf for download.
20/07/2023 Superseded SF3236-LL07 REV A LANDSCAPE PROPOSALS - GREEN INFASTRUCTURE ZONE D
11/01/2023
Checkbox input: Select 231002 84465-WSP-XX-DR-010 Rev A.pdf for download.
10/02/2023 AMENDED 84465-WSP-XX-DR-010 REV A STANIFIELD LANE ACCESS JUNCTION TOPHASE D
22/02/2023
Checkbox input: Select 230210 SF3236 AIA01 - Rev B - 1 of 6 Phase A Green Infrastructure.pdf for download.
20/07/2023 Superseded 10/02/2023 AMENDED AIA01 - REV B - 1 OF 6 PHASE A GREEN INFASTRUCTURE
22/02/2023
Checkbox input: Select 230210 SF3236 AIA01 - Rev B - 2 of 6 Phase A Green Corridor.pdf for download.
20/07/2023 Superseded 10/02/2023 AMENDED AIA01 - REV B - 2 OF 6 PHASE GREEN CORRIDOR
22/02/2023
Checkbox input: Select 230210 SF3236 AIA01 - Rev B - 3 of 6 Wigan Rd Junction.pdf for download.
20/07/2023 Superseded 10/02/2023 AMENDED AIA01 - REV B - 3 OF 6 WIGAN ROAD JUNCTION
22/02/2023
Checkbox input: Select 230210 SF3236 AIA01 - Rev B - 4 of 6 Stainfiled Ln.Junction.pdf for download.
20/07/2023 Superseded 10/02/2023 AMENDED AIA01 - REV B - 4 OF 6 STANIFIELD LANE JUNCTION
22/02/2023
Checkbox input: Select 230210 SF3236 AIA01 - Rev B - 5 of 6 Zone D East.pdf for download.
10/02/2023 AMENDED AIA01 - REV B - 5 OF 6 ZONE D EAST
22/02/2023
Checkbox input: Select 230210 SF3236 AIA01 - Rev B - 6 of 6 Zone E Residential.pdf for download.
10/02/2023 AMENDED AIA01 - REV B - 6 OF 6 ZONE E RESIDENTIAL
22/02/2023
Checkbox input: Select 2023-04-11T08_30_06+00_0021017-FRA-XX-ZZ-DR-A-9111_P13_Parameters Plan 1.pdf for download.
20/07/2023 AMENDED DR-A-9111_P13_Parameters Plan 1
26/07/2023
Checkbox input: Select 2023-04-11T08_30_06+00_0021017-FRA-XX-ZZ-DR-A-9112-P19_Parameters Plan 2.pdf for download.
20/07/2023 AMENDED DR-A-9112-P19_Parameters Plan 2
26/07/2023
Checkbox input: Select 2023-04-11T08_30_06+00_0021017-FRA-XX-ZZ-DR-A-9113_P14_Parameters Plan 3.pdf for download.
20/07/2023 AMENDED DR-A-9113_P14_Parameters Plan 3
26/07/2023
Checkbox input: Select 21017-FRA-Z1-GF-DR-A-20-1005_P1_Proposed GA Substation & Pumphouse Plan Key.pdf for download.
20/07/2023 DR-A-20-1005_P1_Proposed GA Substation & Pumphouse Plan Key
26/07/2023
Checkbox input: Select 21017-FRA-Z1-ZZ-DR-A-20-1002_P2_Proposed GA Pump House Elevations.pdf for download.
20/07/2023 DR-A-20-1002_P2_Proposed GA Pump House Elevations
26/07/2023
Checkbox input: Select 21017-FRA-Z1-ZZ-DR-A-22-1005_P1_Pump House Boundary Line Section.pdf for download.
20/07/2023 DR-A-22-1005_P1_Pump House Boundary Line Section
26/07/2023
Checkbox input: Select 21017-FRA-Z1-ZZ-DR-A-22-1006_P2_Substation Boundary Line Section.pdf for download.
20/07/2023 DR-A-22-1006_P2_Substation Boundary Line Section
26/07/2023
Checkbox input: Select 21017-FRA-Z1-GF-DR-A-20-1001_P1_Proposed GA Pump House Plan.pdf for download.
20/07/2023 DR-A-20-1001_P1_Proposed GA Pump House Plan
26/07/2023
Checkbox input: Select 21017-FRA-Z1-GF-DR-A-20-1003_P2_Proposed GA Substation Plan.pdf for download.
20/07/2023 DR-A-20-1003_P2_Proposed GA Substation Plan
26/07/2023
Checkbox input: Select 21017-FRA-Z1-GF-DR-A-20-1004_P2_Proposed GA Substation Elevations.pdf for download.
20/07/2023 DR-A-20-1004_P2_Proposed GA Substation Elevations
26/07/2023
Checkbox input: Select 230711 SF 3236 LL04 Rev J - Landscape Proposals - Green Infrastructure Zone A.pdf for download.
20/07/2023 Amended SF 3236 LL04 Rev J - Landscape Proposals - Green Infrastructure Zone A.pdf
27/07/2023
Checkbox input: Select 230711 SF 3236 LL05 Rev J - Landscape Proposals - Green Infrastructure Zone B.pdf for download.
20/07/2023 Amended SF 3236 LL05 Rev J - Landscape Proposals - Green Infrastructure Zone B.pdf
27/07/2023
Checkbox input: Select 230711 SF 3236 LL06 Rev K - Landscape Proposals - Green Infrastructure Zone C.pdf for download.
20/07/2023 Amended SF 3236 LL06 Rev K - Landscape Proposals - Green Infrastructure Zone C.pdf
27/07/2023
Checkbox input: Select 230711 SF 3236 LL07 Rev H - Landscape Proposals - Green Infrastructure Zone D.pdf for download.
20/07/2023 Amended SF 3236 LL07 Rev H - Landscape Proposals - Green Infrastructure Zone D.pdf
27/07/2023
Checkbox input: Select 230711 SF 3236 LL08 Rev H - Landscape Proposals - Green Infrastructure Masterplan.pdf for download.
20/07/2023 230711 SF 3236 LL08 Rev H - Landscape Proposals - Green Infrastructure Masterplan.pdf
27/07/2023
Checkbox input: Select 230711 SF 3236 LL09 Rev E - Landscape Proposals - Green Infrastructure Zone E.pdf for download.
20/07/2023 230711 SF 3236 LL09 Rev E - Landscape Proposals - Green Infrastructure Zone E.pdf
27/07/2023
Checkbox input: Select 230707 SF3236 AIA01 Rev H-2 of 3 Phase A Green Corridor.pdf for download.
20/07/2023 Amended AIA01 Rev H-2 of 3 Phase A Green Corridor
27/07/2023
Checkbox input: Select 230707 SF3236 AIA01 Rev H-3 of 4 Wigan Rd Junction.pdf for download.
20/07/2023 Amended AIA01 Rev H-3 of 4 Wigan Rd Junction
27/07/2023
Checkbox input: Select 230707 SF3236 AIA01 Rev H-4 of 4 Stainfiled Ln. Junction.pdf for download.
20/07/2023 Amended AIA01 Rev H-4 of 4 Stainfiled Ln. Junction
27/07/2023
Checkbox input: Select 230707 SF3236 AIA01 Rev H-1 of 4 Phase A Green Infrastructure.pdf for download.
20/07/2023 Amended AIA01 Rev H-1 of 4 Phase A Green Infrastructure
27/07/2023
Checkbox input: Select 230707 SF3236 TS01 - Rev B.pdf for download.
20/07/2023 SF3236 TS01 Tree Survey Plan - Rev B
27/07/2023
Checkbox input: Select 21017-Design Access Statement-P5-20220701.pdf for download.
22/12/2022 SUPERSEDED DESIGN & ACCESS STATEMENT
22/08/2022
Checkbox input: Select 21017-Design Code-P5-2022.07.01(1).pdf for download.
22/12/2022 SUPERSEDED DESIGN CODE
22/08/2022
Checkbox input: Select Biodiversity Net Gain Lancashire Central R4.pdf for download.
22/12/2022 SUPERSEDED BIODIVERSITY NET GAIN REPORT
22/08/2022
Checkbox input: Select Lancashire Central TA V0.3_Optimized i text plus app A to C - Updated Parameter Plans.pdf for download.
TRANSPORT ASSESSMENT - TEXT PLUS APPENDIX A - C
22/08/2022
Checkbox input: Select Lancashire Central TA V0.3_Optimized ii app D to F - Updated Parameter Plans r.pdf for download.
TRANSPORT ASSESSMENT - APPENDIX D - F
22/08/2022
Checkbox input: Select Lancashire Central TA V0.3_Optimized iii app G to H.pdf for download.
TRANSPORT ASSESSMENT - APPENDIX G - H
22/08/2022
Checkbox input: Select Lancashire Central TA V0.3_Optimized iv app I and J.pdf for download.
TRANSPORT ASSESSMENT - APPENDIX I - J PART 1
22/08/2022
Checkbox input: Select Lancashire Central TA V0.3_Optimized v app J.pdf for download.
TRANSPORT ASSESSMENT - APPENDIX J PART 2
22/08/2022
Checkbox input: Select Lancashire Central TA V0.3_Optimized vi app J.pdf for download.
TRANSPORT ASSESSMENT - APPENDIX J PART 3
22/08/2022
Checkbox input: Select Lancashire Central TA V0.3_Optimized vii app K.pdf for download.
TRANSPORT ASSESSMENT - APPENDIX K
22/08/2022
Checkbox input: Select WIE11556-109-R-1.1.6 - Lancashire Central Residential Suitability Report.pdf for download.
22/12/2022 SUPERSEDED SITE SUITABILITY REPORT
22/08/2022
Checkbox input: Select WIE11556-110-R-2-3-2-MRA.pdf for download.
MINERALS RESOURCE ASSESSMENT
22/08/2022
Checkbox input: Select MRA Appendix A.pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX A
22/08/2022
Checkbox input: Select MRA Appendix B.pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX B
22/08/2022
Checkbox input: Select MRA Appendix C (Part1).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 1)
22/08/2022
Checkbox input: Select MRA Appendix C (Part2).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 2)
22/08/2022
Checkbox input: Select MRA Appendix C (Part3)r.pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 3)
22/08/2022
Checkbox input: Select MRA Appendix C (Part4).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 4)
22/08/2022
Checkbox input: Select MRA Appendix C (Part5).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 5)
22/08/2022
Checkbox input: Select MRA Appendix C (Part6).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART6)
22/08/2022
Checkbox input: Select MRA Appendix C (Part7).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 7)
22/08/2022
Checkbox input: Select MRA Appendix C (Part8)r.pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 8)
22/08/2022
Checkbox input: Select MRA Appendix C (Part9).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 9)
22/08/2022
Checkbox input: Select MRA Appendix C (Part10).pdf for download.
MINERALS RESOURCE ASSESSMENT - APPENDIX C (PART 10)
22/08/2022
Checkbox input: Select WC 22-06-23 Energy Reprt FINAL V1.pdf for download.
ENERGY STRATEGY
22/08/2022
Checkbox input: Select WC 22-06-23 Utilities Report V1.pdf for download.
UTILITIES STATEMENT
22/08/2022
Checkbox input: Select WC 220624 21616 (Lancashire Central) Planning Statement Optimised.pdf for download.
PLANNING STATEMENT
22/08/2022
Checkbox input: Select WC 220624 21616 A5 SS 220616 RIA FINAL.pdf for download.
RETAIL AND LEISURE ASSESSMENT
22/08/2022
Checkbox input: Select WC 220624 Built Heritage Statement(1).pdf for download.
BUILT HERITAGE STATEMENT
22/08/2022
Checkbox input: Select WC 220711 WIE11556-107-R-1-3-1.pdf for download.
SUSTAINABILITY STATEMENT
22/08/2022
Checkbox input: Select WC 20220621 Lancashire Central_BREEAM Pre-assessment v3 (Issued).pdf for download.
BREEAM PRE-ASSESSMENT
22/08/2022
Checkbox input: Select WC 70084465 - Lancashire Central - Travel Plan - V1_Optimized_UpdatedPPr.pdf for download.
FRAMEWORK TRAVEL PLAN
22/08/2022
Checkbox input: Select WC DSFRA.pdf for download.
DRAINAGE STRATEGY AND FLOOD RISK ASSESSMENT
22/08/2022
Checkbox input: Select WC DSFRA App A.pdf for download.
DSFRA APPENDICES A - TOPOGRAPHIC SURVEY
22/08/2022
Checkbox input: Select WC DSFRA App B Part 1 of 2.pdf for download.
DSFRA APPENDICES B - DRAINAGE SURVEY PART 1 OF 2
22/08/2022
Checkbox input: Select WC DSFRA App B Part 2 of 2R.pdf for download.
DSFRA APPENDICES B - DRAINAGE SURVEY PART 2 OF 2
22/08/2022
Checkbox input: Select WC DSFRA App C.pdf for download.
DSFRA APPENDICES C - GREENFIELD RUN-OFF ASSESSMENT
22/08/2022
Checkbox input: Select WC DSFRA App D.pdf for download.
DSFRA APPENDICES D - PROPOSED CATCHMENT PLANS
22/08/2022
Checkbox input: Select WC DSFRA App E.pdf for download.
DSFRA APPENDICES E - ATTENUATION SCHEDULES & SUPPORTING MICRO DRAINAGE
22/08/2022
Checkbox input: Select WC DSFRA App F Part 1 of 3.pdf for download.
DSFRA APPENDICES F - BELOW GROUND ATTENUATION PART 1 OF 3
22/08/2022
Checkbox input: Select WC DSFRA App F Part 2 of 3.pdf for download.
DSFRA APP F - BELOW GROUND ATTENUATION PART 2 OF 3
22/08/2022
Checkbox input: Select WC DSFRA App F Part 3 of 3.pdf for download.
DSFRA APP F - BELOW GROUND ATTENUATION PART 3 OF 3
22/08/2022
Checkbox input: Select WC DSFRA App G.pdf for download.
DSFRA APP G - CORRESPONDANCE WITH UNITED UTILITIES
22/08/2022
Checkbox input: Select WC DSFRA App H.pdf for download.
DSFRA APP H - MOTT MACDONALD M65 OUTLINE DRAINAGE STRATEGY
22/08/2022
Checkbox input: Select WC DSFRA App I.pdf for download.
DSFRA APP I - CORRESPONDANCE WITH LANCASHIRE COUNTY COUNCIL
22/08/2022
Checkbox input: Select WC Employment Market Report - Lancashire Central (Cuerden Strategic Site).pdf for download.
EMPLOYMENT LAND COMMENTARY
22/08/2022
Checkbox input: Select WC Employment Skillls Statement.pdf for download.
EMPLOYMENT SKILLS STATEMENT
22/08/2022
Checkbox input: Select WC Lancashire Central - Economic Benefits Statement 28.06.22 Final.pdf for download.
ECONOMIC BENEFITS STATEMENT
22/08/2022
Checkbox input: Select WC Lancashire Central SCI FINAL 280622.pdf for download.
STATEMENT OF COMMUNITY INVOLVEMENT
22/08/2022
Checkbox input: Select WC Lancashire Central Site Cuerden - Summary of Archaeological Investigations.pdf for download.
SUMMARY OF ARCHAEOLOGICAL INVESTIGATIONS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA.pdf for download.
GROUND CONDITIONS: PRELIMINARY RISK ASSESSMENT
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix A.pdf for download.
PRA APPENDIX A - SITE PLANS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix B.pdf for download.
PRA APPENDIX B - SITE PHOTOGRAPHS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C1.pdf for download.
PRA APPENDIX C1 - LANDMARK ENVIROCHECK REPORT
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C2.pdf for download.
PRA APPENDIX C2 - LANDMARK ENVIROCHECK REPORT
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C3.pdf for download.
PRA APPENDIX C3 - LANDMARK ENVIROCHECK REPORT
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C4.pdf for download.
PRA APPENDIX C4 - MINING AND GROUND STABILITY
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C5.pdf for download.
PRA APPENDIX C5 - PLANS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C6.pdf for download.
PRA APPENDIX C6 - PLANS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C7.pdf for download.
PRA APPENDIX C7 - PLANS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C8.pdf for download.
PRA APPENDIX C8 - PLANS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C9.pdf for download.
PRA APPENDIX C9 - PLANS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix C10.pdf for download.
PRA APPENDIX C10 - PLANS
22/08/2022
Checkbox input: Select WC WIE11556-110-R-1.3.1-PRA Appendix D_E_F_G.pdf for download.
PRA APPENDIX D,E,F,G - CONSULTATION INFORMATION
22/08/2022
Checkbox input: Select WCr Financial Viability Statement_Part1.pdf for download.
21/09/2022 SUPERSEDED FINANCIAL VIABILITY STATEMENT PART 1
22/08/2022
Checkbox input: Select WCr Financial Viability Statement_Part2.pdf for download.
FINANCIAL VIABILITY STATEMENT PART 2
22/08/2022
Checkbox input: Select WCr Financial Viability Statement_Part3.pdf for download.
21/09/2022 SUPERSEDED FINANCIAL VIABILITY STATEMENT PART 3
22/08/2022
Checkbox input: Select 21.09.2022 Amended Financial Viability Statement - Lancashire Central (Cuerden Strategic Site)_Redacted.pdf for download.
21/09/2022 AMENDED FINANCIAL VIABILITY STATEMENT
21/09/2022
Checkbox input: Select 220110 21616 (Lancashire Central) Guide to Documents for Approval.pdf for download.
GUIDE TO DOCUMENTS FOR APPROVAL
11/01/2023
Checkbox input: Select 230110 21616 (Lancashire Central) Response to Consultation Comments_Redacted.pdf for download.
RESPONSE TO CONSULTATION COMMENTS
11/01/2023
Checkbox input: Select WIE11556-109-R-1.3.2 - Lanc Central Res Suitability Report.pdf for download.
22/12/2022 AMENDED SITE SUITABILITY REPORT NOVEMBER 2022
09/01/2023
Checkbox input: Select SF3236 Rev C Lancashire Central Arboricultural Survey Report.pdf for download.
10/02/2023 SUPERSEDED ARBORICULTURAL SURVEY REPORT REV C NOVEMBER 2022
09/01/2023
Checkbox input: Select Ecology Additional Information Nov 2022_Redacted.pdf for download.
ECOLOGY ADDITIONAL INFORMATION NOVEMBER 2022
09/01/2023
Checkbox input: Select Biodiversity Metric 3.1 Lancashire Central Full Site 2017 R6.pdf for download.
BIODIVERSITY METRIC 3.1
09/01/2023
Checkbox input: Select Biodiversity Metric 3.1 Lancashire Central Full Site 2017 R6.xlsm for download.
BIODIVERSITY METRIC 3.1 SPREADSHEET
09/01/2023
Checkbox input: Select Biodiversity Net Gain Lancashire Central R5.pdf for download.
22/12/2022 AMENDED BIODIVERSITY NET GAIN
09/01/2023
Checkbox input: Select 21017-Design & Access Statement-P6-2022.11.28.pdf for download.
22/12/2022 AMENDED DESIGN & ACCESS STATEMENT
10/01/2023
Checkbox input: Select 21017-Design Code_P7_2022.12.15.pdf for download.
10/02/2023 SUPERSEDED 22/12/2022 AMENDED DESIGN CODE
10/01/2023
Checkbox input: Select 230210 21616 (Lancashire Central) Response to Consultation Comments_Redacted.pdf for download.
10/02/2023 COVER LETTER
22/02/2023
Checkbox input: Select 230210 21017-Design Code_P12_2023.02.02 reduced file size.pdf for download.
10/02/2023 AMENDED DESIGN CODE REV P12
22/02/2023
Checkbox input: Select 230210 SF3236 Rev D Lancashire Central Arb Survey Report.pdf for download.
20/07/2023 Superseded 10/02/2023 AMENDED ARBORICULTURAL SURVEY REPORT REV D
22/02/2023
Checkbox input: Select 230224 21616 (Lancashire Central) Response to BGL_Redacted.pdf for download.
24/02/2023 RESPONSE TO BROOKHOUSE GROUP LIMITED
24/02/2023
Checkbox input: Select 952E4638.PDF for download.
24/02/2023 RESPONSE TO LCC COVERING LETTER
24/02/2023
Checkbox input: Select 230224~4(1).PDF for download.
24/02/2023 BIODIVERSITY NET GAIN
24/02/2023
Checkbox input: Select 230224 21616 (Lancashire Central) Biodiversity Metric 3.1 Lancashire Central Full Site 2017 R7.pdf for download.
24/02/2023 BIODIVERSITY METRIC 3.1 FULL SITE
24/02/2023
Checkbox input: Select 230224 21616 (Lancashire Central) Biodiversity Metric 3.1 Calculations for delays in habitat creation test sheet.pdf for download.
24/02/2023 BIODIVERSITY METRIC 3.1 CALCULATIONS FOR DELAYS IN HABITAT CREATION TEST SHEET
24/02/2023
Checkbox input: Select 230224 21616 (Lancashire Central) Response to SRBC and PCC_Redacted(1).pdf for download.
24/02/2023 RESPONSE TO SRBC AND PCC
24/02/2023
Checkbox input: Select 230224 21616 (Lancashire Central) Supplementary Retail Note.pdf for download.
24/02/2023 SUPPLEMENTARY RETAIL NOTE
24/02/2023
Checkbox input: Select 05.07.23 Cuerden Viability Review_Redacted.pdf for download.
VIABILITY REVIEW - ROGER HANNAH
07/07/2023
Checkbox input: Select 230720 33583 FINAL 3 (Lancashire Central) Covering Letter_Redacted.pdf for download.
20/07/2023 Agent Covering Letter
26/07/2023
Checkbox input: Select 230713 33583 (Lancashire Central) Response to Landscaping Comments.pdf for download.
20/07/2023 Agent Response to Landscaping Comments
27/07/2023
Checkbox input: Select 230707 SF3236 Rev H Lancashire Central Arb Survey Report.pdf for download.
20/07/2023 Amended Central Arboricultural Survey Report
27/07/2023
Checkbox input: Select 230720 33313558300 FINAL 1 (Lancashire Central) Covering Letter_Redacted.pdf for download.
20/07/2023 Agent Covering Letter
27/07/2023
Checkbox input: Select 1. Lancashire Central - Summary of Latest Information_190723.pdf for download.
24/10/2023 Superseded 20/07/2023 - 1. Summary of Latest Information
27/07/2023
Checkbox input: Select 2. All Drawings.pdf for download.
24/10/2023 Superseded 20/07/2023 - 2. All Drawings.pdf
27/07/2023
Checkbox input: Select 3. Lancashire Central - Model Scenarios and Re-routing Assumptions_Final.pdf for download.
20/07/2023 - 3. Model Scenarios and Re-routing Assumptions_Final
27/07/2023
Checkbox input: Select 4. Lancashire Central - Base year growth rates_080623.pdf for download.
20/07/2023 - 4. Base year growth rates
27/07/2023
Checkbox input: Select 5. 230710-MM-M65 Terminus Roundabout Addendum RSA 1 Draft v1.pdf for download.
20/07/2023 - 5. M65 Terminus Roundabout Addendum RSA 1 Draft v1
27/07/2023
Checkbox input: Select 6. M65 Terminus - Technical Note 001 (003).pdf for download.
20/07/2023 - 6. M65 Terminus - Technical Note 001 (003)
27/07/2023
Checkbox input: Select 7a. Email summarising additional traffic surveys at A6-A582.pdf for download.
20/07/2023 - 7a. Email summarising additional traffic surveys at A6-A582
27/07/2023
Checkbox input: Select 7b Client Results - 11212 Preston - LC1-LC3 - WSP.xlsx for download.
20/07/2023 - 7b Client Results - 11212 Preston - LC1-LC3 - WSP.xlsx
27/07/2023
Checkbox input: Select 7c Client Results - 11212 Preston - Queue.xlsx for download.
20/07/2023 - 7c Client Results - 11212 Preston - Queue.xlsx
27/07/2023
Checkbox input: Select 8. 84465-WSP-SBR-RP-CB-001_Church Road North Bridge_RSRF Rev P01 Draft.pdf for download.
20/07/2023 - 8. 84465-WSP-SBR-RP-CB-001_Church Road North Bridge_RSRF Rev P01 Draft.pdf
27/07/2023
Checkbox input: Select 9. Roundabout Compliance Summary.xlsx for download.
20/07/2023 - 9. Roundabout Compliance Summary
27/07/2023
Checkbox input: Select 230725 33313558300 FINAL 1 (Lancashire Central) Covering Letter_Redacted.pdf for download.
25/07/2023 Agent Cover Letter
27/07/2023
Checkbox input: Select Lancashire Central - Modelling Note 250723.pdf for download.
25/07/2023 Modelling Note
27/07/2023
Checkbox input: Select 230724-PS-Lancashire Central VISSIM Techincal Note.pdf for download.
25/07/2023 VISSIM Techincal Note
27/07/2023
Checkbox input: Select (0) 231024 33313558300 FINAL 1 (Lancashire Central) Covering Letter.pdf for download.
24/10/2023 Covering letter from agent
25/10/2023
Checkbox input: Select (1) 231024 33313558300 FINAL 1 (Lancashire Central) Document Submission Tracker.pdf for download.
24/10/2023 - 1. Document submission tracker
25/10/2023
Checkbox input: Select (2) 231024 33313558300 FINAL 1 (Lancashire Central) Guide To Documents.pdf for download.
24/10/2023 - 2. Guide to Documents
25/10/2023
Checkbox input: Select (3) 231024 21616 Lancashire Central - EIA Letter of Compliance October 2023_Final.pdf for download.
24/10/2023 - 3. EIA letter of compliance October 2023
25/10/2023
Checkbox input: Select (4) All Drawings (23 Oct update).pdf for download.
24/10/2023 - 4. All drawings (23 Oct update)
25/10/2023
Checkbox input: Select (5) Lancashire Central - Summary of Highway Mitigation.pdf for download.
24/10/2023 - 5. Summary of Highway Mitigation
25/10/2023
Checkbox input: Select (6) Cover Letter.pdf for download.
24/10/2023 - 6. Summary of post application submissions to National Highways
25/10/2023
Checkbox input: Select (7) 84465-WSP-XX-DR-020_P02.pdf for download.
24/10/2023 - 7. 84465-WSP-XX-DR-020 REV P02 M6 Junction 29 proposed traffic signals
25/10/2023
Checkbox input: Select (8) 70084465-RS1 M6 Junction 29 -Issued_Redacted.pdf for download.
24/10/2023 - 8. M6 Jct 29 South Stage 1 Road Safety Audit
25/10/2023
Checkbox input: Select (9) M6 Jct 29 south - Designers response.pdf for download.
24/10/2023 - 9. M6 Jct 29 South - Designers response
25/10/2023
Checkbox input: Select (10) 84465-WSP-XX-DR-004_P08.pdf for download.
24/10/2023 - 10. 84465-WSP-XX-DR-004 REV P08 M65 Terminus roundabout
25/10/2023
Checkbox input: Select (11) 84465-WSP-XX-DR-004 Spreadsheet Mark-Up(1).pdf for download.
24/10/2023 - 11. 84465-WSP-XX-DR-004 P06 M65 Terminus Roundabout - Spreadsheet mark up
25/10/2023
Checkbox input: Select (12) Roundabout Compliance Summary.pdf for download.
24/10/2023 - 12. Roundabout Compliance Summary
25/10/2023
Checkbox input: Select (13) M65 Terminus - Technical Note 001.pdf for download.
24/10/2023 - 13. M65 - Design Review Technical Note
25/10/2023
Checkbox input: Select (14) 231006 - Application For Departure from Standard 03-2020 - Gantries.pdf for download.
24/10/2023 - 14. Application for Departure from Standard (DFS) - Gantries
25/10/2023
Checkbox input: Select (15) 231006 - Application For Departure from Standard 03-2020 - Entry Path Radii.pdf for download.
24/10/2023 - 15 Application for Departure from Standard - Entry Path Radii
25/10/2023
Checkbox input: Select (16) 84465-WSP-XX-DR-010_P04.pdf for download.
24/10/2023 - 16. 84465-WSP-XX-DR-010 REV P04 Stanifield Lane Access Junction to Phase D extent of detailed application
25/10/2023
Checkbox input: Select (17) 21017-FRA-XX-ZZ-DR-A-9112-P20_Parameters Plan 2.pdf for download.
24/10/2023 - 17. 21017-FRA-XX-ZZ-DR-A-9112 P20 Parameters Plan 2 - Highways and Access
25/10/2023
Checkbox input: Select Transmittal - 00019.pdf for download.
24/10/2023 - Transmittal
25/10/2023
Checkbox input: Select 231101 33313558300 A5 FINAL 1 (Lancashire Central) Response to BGL including Appendices_Redacted.pdf for download.
01/11/2023 Agents Response to Brookhouse Group Comments
23/11/2023
Checkbox input: Select ES Non-Technical Summary a (2).pdf for download.
NON-TECHNICAL SUMMARY A
22/08/2022
Checkbox input: Select ES Non-Technical Summary b (1).pdf for download.
22/12/2022 SUPERSEDED NON-TECHNICAL SUMMARY B
22/08/2022
Checkbox input: Select ES Non-Technical Summary c .pdf for download.
22/12/2022 SUPERSEDED NON-TECHNICAL SUMMARY C
22/08/2022
Checkbox input: Select ES Non-Technical Summary d .pdf for download.
22/12/2022 SUPERSEDED NON-TECHNICAL SUMMARY D
22/08/2022
Checkbox input: Select ES Non Technical Summary e.pdf for download.
NON-TECHNICAL SUMMARY E
22/08/2022
Checkbox input: Select ES Non Technical Summary f.pdf for download.
NON-TECHNICAL SUMMARY F
22/08/2022
Checkbox input: Select ES Non Technical Summary g.pdf for download.
NON-TECHNICAL SUMMARY G
22/08/2022
Checkbox input: Select ES Non Technical Summary h.pdf for download.
NON-TECHNICAL SUMMARY H
22/08/2022
Checkbox input: Select ES Non-Technical Summary i .pdf for download.
NON-TECHNICAL SUMMARY I
22/08/2022
Checkbox input: Select ES Non-Technical Summary j .pdf for download.
NON-TECHNICAL SUMMARY J
22/08/2022
Checkbox input: Select ES Non-Technical Summary k .pdf for download.
NON-TECHNICAL SUMMARY K
22/08/2022
Checkbox input: Select ES Vol 1 Main Text and Figures Contents.pdf for download.
VOLUME 1 MAIN TEXT AND FIGURES CONTENTS
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 1 Introduction.pdf for download.
VOLUME 1 CHAPTER 1 INTRODUCTION
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 2 EIA Methodology.pdf for download.
VOLUME 1 CHAPTER 2 EIA METHODOLOGY
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 3 Site and Development.pdf for download.
VOLUME 1 CHAPTER 3 SITE AND DEVELOPMENT DESCRIPTION
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 4 Alternatives.pdf for download.
VOLUME 1 CHAPTER 4 ALTERNATIVES & DESIGN EVOLUTION
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 5 Construction.pdf for download.
VOLUME 1 CHAPTER 5 CONSTRUCTION METHOLDOLOGY & PHASING
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 6 Socioeconomics.pdf for download.
VOLUME 1 CHAPTER 6 SOCIO-ECONOMICS
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 7 Landscape and Views.pdf for download.
10/02/2023 SUPERSEDED VOLUME 1 CHAPTER 7 LANDSCAPE AND VIEWS
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 8 Built Heritage.pdf for download.
VOLUME 1 CHAPTER 8 BUILT HERITAGE
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 9 Transport and Access.pdf for download.
VOLUME 1 CHAPTER 9 TRANSPORT AND ACCESS
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 10 Noise.pdf for download.
VOLUME 1 CHAPTER 10 NOISE AND VIBRATION
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 11 Air Quality.pdf for download.
VOLUME 1 CHAPTER 11 AIR QUALITY
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 12 Ecology.pdf for download.
VOLUME 1 CHAPTER 12 ECOLOGY
22/08/2022
Checkbox input: Select ES Vol 1 Chapter 13 Summary.pdf for download.
VOLUME 1 CHAPTER 13 SUMMARY AND RESIDUAL EFFECTS
22/08/2022
Checkbox input: Select ES Vol 1 Figure 1.1 Red Line Boundary.pdf for download.
VOL 1 FIGURE 1.1 RED LINE BOUNDARY
22/08/2022
Checkbox input: Select ES Vol 1 Figure 2.1 Cumulative Schemes Plan.pdf for download.
22/12/2022 SUPERSEDED VOL 1 FIGURE 2.1 CUMULATIVE SCHEMES PLAN
22/08/2022
Checkbox input: Select ES Vol 1 Figure 3.1a - Features Plan (Road Network).pdf for download.
22/12/2022 SUPERSEDED VOL 1 FIGURE 3.1A FEATURES PLAN (ROAD NETWORK)
22/08/2022
Checkbox input: Select ES Vol 1 Figure 3.1b - Features Plan (Designations).pdf for download.
22/12/2022 SUPERSEDED VOL 1 FIGURE 3.1B FEATURE PLAN (DESIGNATIONS)
22/08/2022
Checkbox input: Select ES Vol 1 Figure 3.2 Development Zones Land Use and Quantum and Building Heights.pdf for download.
VOL 1 FIGURE 3.2 DEVELOPMENT ZONES, LAND USE AND QUANTUM AND BUILDING HEIGHTS
22/08/2022
Checkbox input: Select ES Vol 1 Figure 3.3 Highways and Access.pdf for download.
VOL 1 FIGURE 3.3 HIGHWAYS AND ACCESS
22/08/2022
Checkbox input: Select ES Vol 1 Figure 3.4 Landscape and Parameters Plan.pdf for download.
VOL 1 FIGURE 3.4 LANDSCAPE AND PARAMETERS PLAN
22/08/2022
Checkbox input: Select ES Vol 1 Figure 3.5 Illustrative Masterplan.pdf for download.
VOL 1 FIGURE 3.5 ILLUSTRATIVE MASTERPLAN
22/08/2022
Checkbox input: Select ES Vol 1 Figure 5.1 Outline Phasing Strategy.pdf for download.
VOL 1 FIGURE 5.1 OUTLINE PHASING STRATEGY
22/08/2022
Checkbox input: Select ES Vol 1 Figure 8.1 Heritage Assets.pdf for download.
VOL 1 FIGURE 8.1 HERITAGE ASSETS
22/08/2022
Checkbox input: Select ES Vol 1 Figure 10.1 Noise Receptors.pdf for download.
VOL 1 FIGURE 10.1 NOISE RECEPTORS
22/08/2022
Checkbox input: Select ES Vol 1 Figure 11.1 Site Plan and Receptor Locations.pdf for download.
VOL 1 FIGURE 11.1 SITE PLAN AND RECEPTOR LOCATIONS
22/08/2022
Checkbox input: Select ES Vol 1 Figure 11.2 Construction Phase Receptor Plans and AQMA.pdf for download.
VOL 1 FIGURE 11.2 CONSTRUCTION PHASE RECEPTOR PLAN
22/08/2022
Checkbox input: Select ES Vol 2 - Appendices Contents Page.pdf for download.
VOL 2 APPENDICES CONTENTS PAGE
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 1.1 Location of Information Within the ES.pdf for download.
VOL 2 APPENDIX 1.1 LOCATION OF INFORMATION WITHIN THE ES
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 1.2 Expertise Statement.pdf for download.
VOL 2 APPENDIX 1.2 EXPERTISE STATEMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 2.1 EIA Scoping Report.pdf for download.
VOL 2 APPENDIX 2.1 EIA SCOPING REPORT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 2.2 Scoping Opinion LCC.pdf for download.
VOL 2 APPENDIX 2.2 SCOPING OPINION LCC
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.1 - Methodology.pdf for download.
VOL 2 APPENDIX 7.1 METHODOLOGY
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.2 - Landscape planning policy designations.pdf for download.
VOL 2 APPENDIX 7.2 LANDSCAPE PLANNING POLICY DESIGNATIONS
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.3 - Published sources of landscape character.pdf for download.
VOL 2 APPENDIX 7.3 PUBLISHED SOURCES OF LANDSCAPE CHARACTER
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.4 - Cumulative sites.pdf for download.
VOL 2 APPENDIX 7.4 CUMULATIVE SITES
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.5 - Landscape assets.pdf for download.
VOL 2 APPENDIX 7.5 LANDSCAPE ASSETS
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.6 Topography.pdf for download.
VOL 2 APPENDIX 7.6 TOPOGRAPHY
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.7 Site specific landscape character areas.pdf for download.
VOL 2 APPENDIX 7.7 SITE SPECIFIC LANDSCAPE CHARACTER AREAS
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.8 Public rights of way.pdf for download.
VOL 2 APPENDIX 7.8 PUBLIC RIGHTS OF WAY
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.9 Proposed landscape mitigation.pdf for download.
VOL 2 APPENDIX 7.9 PROPOSED LANDSCAPE MITIGATION
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.10a - Visual receptors.pdf for download.
VOL 2 APPENDIX 7.10A VISUAL RECEPTORS
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 7.10br - Visual receptors.pdf for download.
VOL 2 APPENDIX 7.10B VISUAL RECEPTORS
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 8.1 Built Heritage Statement.pdf for download.
VOL 2 APPENDIX 8.1 BUILT HERITAGE STATEMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-a Transport Assessment.pdf for download.
VOL 2 APPENDIX 9-1A TRANSPORT ASSESSMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-b Transport Assessment_Part1.pdf for download.
VOL 2 APPENDIX 9-1B TRANSPORT ASSESSMENT PART 1
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-b Transport Assessment_Part2.pdf for download.
VOL 2 APPENDIX 9-1B TRANSPORT ASSESSMENT PART 2
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-c Transport Assessment.pdf for download.
VOL 2 APPENDIX 9-1C TRANSPORT ASSESSMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-d Transport Assessment.pdf for download.
VOL 2 APPENDIX 9-1D TRANSPORT ASSESSMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-e Transport Assessment.pdf for download.
VOL 2 APPENDIX 9-1E TRANSPORT ASSESSMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-f Transport Assessment.pdf for download.
VOL 2 APPENDIX 9-1F TRANSPORT ASSESSMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 9-1-g Transport Assessment.pdf for download.
VOL 2 APPENDIX 9-1G TRANSPORT ASSESSMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 10.1 Glossary of Acoustic Terminology.pdf for download.
VOL 2 APPENDIX 10.1 GLOSSARY OF ACOUSTIC TERMINOLOGY
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 10.2 Baseline Conditions.pdf for download.
VOL 2 APPENDIX 10.2 BASELINE CONDITIONS
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 10.3 Construction Assessment Methodology.pdf for download.
VOL 2 APPENDIX 10.3 CONSTRUCTION ASSESSMENT METHODOLOGY
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 10.4 Road Traffic Noise Assessment.pdf for download.
VOL 2 APPENDIX 10.4 ROAD TRAFFIC NOISE ASSESSMENT
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 11.1 - Air Quality Assessment Detailed Methodology.pdf for download.
VOL 2 APPENDIX 11.1 AIR QUALITY ASSESSMENT DETAILED METHODOLOGY
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 12.1a - Ecological Appraisal.pdf for download.
VOL 2 APPENDIX 12.1A ECOLOGICAL APPRAISAL
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 12.1c - Ecological Appraisal.pdf for download.
VOL 2 APPENDIX 12.1B ECOLOGICAL APPRAISAL
22/08/2022
Checkbox input: Select ES Vol 2 Appendix 12.1d - Ecological Appraisal.pdf for download.
VOL 2 APPENDIX 12.1D ECOLOGICAL APPRAISAL
22/08/2022
Checkbox input: Select ES Non Technical Summary b (Red Line Boundary).pdf for download.
22/12/2022 AMENDED NON TECHNICAL SUMMARY B - RED LINE BOUNDARY
11/01/2023
Checkbox input: Select ES Non Technical Summary c .pdf for download.
22/12/2022 AMENDED NON TECHNICAL SUMMARY C
10/01/2023
Checkbox input: Select ES Non Technical Summary d .pdf for download.
22/12/2022 AMENDED NON TECHNICAL SUMMARY D
10/01/2023
Checkbox input: Select ES Vol 1 Figure 1.1 (Red Line Boundary).pdf for download.
VOLUME 1 FIGURE 1.1 RED LINE BOUNDARY
11/01/2023
Checkbox input: Select Figure 2.1 Cumulative Schemes Plan.pdf for download.
22/12/2022 AMENDED VOLUME 1 FIGURE 2.1 CUMULATIVE SCHEMES PLAN
10/01/2023
Checkbox input: Select FIGURE~2.PDF for download.
22/12/2022 SMENDED VOLUME 1 FIGURE 3.1A FEATURES PLAN ROAD NETWORK
10/01/2023
Checkbox input: Select FIGURE~3.PDF for download.
22/12/2022 AMENDED VOLUME 1 FIGURE 3.1B FEATURES PLAN DESIGNATIONS
10/01/2023
Checkbox input: Select 221222~1.PDF for download.
ES COMPLIANCE NOTE
11/01/2023
Checkbox input: Select 231002~4(1).PDF for download.
10/02/2023 EIA LANDSCAPE LETTER OF COMPLIANCE
22/02/2023
Checkbox input: Select 231002 ES Vol 1 Chapter 7 Landscape and Views Rev A.pdf for download.
10/02/2023 AMENDED VOL 1 CHAPTER 7 - LANDSCAPE AND VIEWS REV A
22/02/2023
Checkbox input: Select 231002 SF 3236 Appendix Part 1 Rev A.pdf for download.
10/02/2023 AMENDED CHAPTER 7 - APPENDIX PART 1 REV A
22/02/2023
Checkbox input: Select Agenda Item 8 LCC.2022.0044 Cuerden Strategic Site.pdf for download.
19/10/2022 COMMITTEE REPORT
18/10/2022
Checkbox input: Select Item 5 LCC.2022.0044 Cuerden Strategic Site.pdf for download.
06/12/2023 Committee Report
05/12/2023
Checkbox input: Select 231206 - LPA Decision.pdf for download.
12/12/2023 Secretary of State - Decision
12/12/2023
Checkbox input: Select LCC.2022.0044 Cuerden Strategic Site. notice.pdf for download.
12/12/2023 Decision Notice
12/12/2023
Checkbox input: Select LCC.2022.0044 Reg 30 report.pdf for download.
12/12/2023 Reg 30 report
12/12/2023
Checkbox input: Select 30.09.2022 Town Legal - Brookhouse Group representation.pdf for download.
30/09/2022 REP TOWN LEGAL ON BEHALF OF BROOKHOUSE GROUP -6
03/10/2022
Checkbox input: Select Ltr - Lancashire County Council - 6.12.22.pdf for download.
06/12/2022 REP BROOKHOUSE GROUP LTD - FURTHER COMMENTS - 6
07/12/2022
Checkbox input: Select Cuerden Objection Planning 2.12.22.pdf for download.
06/12/2022 REP BROOKHOUSE GROUP LTD- FURTHER COMMENTS - 6
07/12/2022
Checkbox input: Select Ltr - Lancashire County Council - 30.9.22 4128-2811-8847 v.1 4156-8050-7711.1(1).pdf for download.
06/12/2022 REP BROOKHOUSE GROUP LTD - FURTHER COMMENTS - 6
07/12/2022
Checkbox input: Select Ltr - Lancashire County Council - 1.11.22 4156-2568-2753 v.1(1).pdf for download.
06/12/2022 REP BROOKHOUSE GROUP LTD - FURTHER COMMENTS - 6
07/12/2022
Checkbox input: Select 221205 J325095 TN04 v.1.2.pdf for download.
06/12/2022 REP BROOKHOUSE GROUP LTD - FURTHER COMMENTS - 6
07/12/2022
Checkbox input: Select 20019 Cuerden Strategic Site Technical note V1.0_Redacted.pdf for download.
REDACTED 06/12/2022 REP BROOKHOUSE GROUP LTD - FURTHER COMMENTS - 6
21/02/2023
Checkbox input: Select Ltr - Lancashire County Council - 23.02.2023 4147-5360-3653 v.2.pdf for download.
23/02/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
23/02/2023
Checkbox input: Select 230221 J325095 TN06 v.1.0.pdf for download.
23/02/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
23/02/2023
Checkbox input: Select Ecus Arb.pdf for download.
23/02/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
23/02/2023
Checkbox input: Select Observations on Amendments to LCC.2022.0044_Redacted.pdf for download.
23/02/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
23/02/2023
Checkbox input: Select 20019 Cuerden Strategic Site Technical note V2.0_Redacted.pdf for download.
23/02/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
23/02/2023
Checkbox input: Select Contact with LCC_Redacted.pdf for download.
23/02/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
23/02/2023
Checkbox input: Select 2023-03-23 BHS response to LCC-2022-0044_Redacted.pdf for download.
23/03/2023 THE BRITISH HORSE SOCIETY COMMENTS
23/03/2023
Checkbox input: Select Ltr - Lancashire County Council - 31.3.23.pdf for download.
31/03/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
04/04/2023
Checkbox input: Select 20019 Cuerden Strategic Site Technical note V5.0_Redacted.pdf for download.
31/03/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
04/04/2023
Checkbox input: Select 290323_Cuerden Strategic Site_Site capacity assessment_P02.pdf for download.
31/03/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
04/04/2023
Checkbox input: Select JLL Letter 27.3.23_Redacted.pdf for download.
31/03/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
04/04/2023
Checkbox input: Select LCC.2022.0044 Commentary on BW Letter 28.2.23 Schedule.pdf for download.
31/03/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
04/04/2023
Checkbox input: Select LCC.2022.0044 Statement on BW Letter 29.2.23 re Brookhouse Reps.pdf for download.
31/03/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
04/04/2023
Checkbox input: Select WSP Comments Review.pdf for download.
31/03/2023 REP BROOKHOUSE LTD FURTHER COMMENTS
04/04/2023
Checkbox input: Select Ltr - Lancashire County Council - 26.9.23 4164-8907-5786 v.1(1).pdf for download.
26/09/2023 Rep Town Legal on behalf of Brookhouse Group
29/09/2023
Checkbox input: Select 230919 J325095 TN07 v.1.1(1).pdf for download.
26/09/2023 Attachment to Town Legal - TN07 v.1.1.pdf
29/09/2023
Checkbox input: Select Cuerden Strategic Site, South Ribble Masterplan and Design Code Audit V2(1).pdf for download.
26/09/2023 Attachment to Town Legal - Masterplan and Design Code Audit V2
29/09/2023
Checkbox input: Select Ltr - Lancashire County Council - 24.11.23 4161-4753-2877.2.pdf for download.
24/11/2023 Rep Town Legal on behalf of Brookhouse Group
27/11/2023
Checkbox input: Select 231124 J325095 TN08 v.1.1.pdf for download.
24/11/2023 Attachment to Town Legal - TN08 v.1.1.pdf
27/11/2023
Checkbox input: Select Ltr - Lancashire County Council - 5.12.23 4132-1815-1245.1.pdf for download.
05/12/2023 Rep Town Legal on behalf of Brookhouse Group Comments
05/12/2023